Feasibility & design
Load and yield analysis, system sizing, single-line diagrams and layout engineering.

Engineering · Procurement · Construction
From feasibility to commissioning, OES takes single-point responsibility for designing, sourcing and building your CATL energy storage project.
01 / Delivery
A single contract covering engineering, CATL equipment supply and construction reduces interfaces, risk and time to energisation.
Load and yield analysis, system sizing, single-line diagrams and layout engineering.
Grid studies, DSO / TSO applications and permitting support in each market.
CATL batteries sourced as an official partner, plus PCS, transformers and balance of plant.
Civil works, foundations, installation, cabling and site safety management.
Testing, EMS integration, grid-code compliance tests and handover documentation.
Preventive maintenance, remote monitoring and CATL warranty management.

On site
Foundations, cabling and installation — delivered by one accountable team.
02 / Why OES
Our EPC approach combines direct access to CATL technology with local engineering and construction partners across Europe.

03 / Contract models
Leading European developers and lenders choose between several delivery models. We support all of them.
Single point of responsibility
One contract for design, CATL supply, construction and commissioning with a fixed price, fixed date and wrapped performance guarantees. Preferred by most lenders.
Supply + BoP contracts
CATL equipment supplied under a separate contract while OES delivers balance of plant and integration. Lower cost, with interfaces carefully managed.
Owner-led delivery
OES manages engineering, procurement and construction on the owner's behalf, for utilities and IPPs with in-house capabilities.
Long-term service
10–20 year service agreements covering maintenance, availability guarantees, capacity augmentation and warranty management.
04 / Quality gates
Independent review of layout, fire strategy and grid studies before procurement.
Witnessed testing of CATL containers, PCS and transformers at the factory.
Mechanical and electrical checks, insulation and protection tests on site.
Verification against grid code and DSO / TSO requirements before energisation.
Round-trip efficiency and usable energy verified, then full documentation handed over.
05 / Safety & compliance
Fire safety, grid compliance and electrical design follow the frameworks that insurers, grid operators and independent engineers expect.
IEC 62933 & IEC 62619
Safety and performance of stationary battery systems and industrial lithium cells.
UL 9540A & NFPA 855
Thermal runaway testing and fire protection design, widely accepted by European insurers.
EU Network Code RfG & EN 50549
Grid connection requirements, applied through national grid codes.
CE marking & EU Battery Regulation
Low Voltage, EMC and Machinery directives, plus battery passport and end-of-life obligations.
ISO 9001 / 14001 / 45001
Quality, environmental and health & safety management on every site.
06 / Bankability
Financing storage in Europe depends on clear guarantees and transparent risk allocation.

Fixed price and date
Delay and performance liquidated damages backed by bonds.
Capacity & efficiency guarantees
Guaranteed usable energy and round-trip efficiency at handover.
Availability guarantees
Contractual uptime under the O&M agreement, typically 97–99%.
Degradation & augmentation plan
CATL-backed capacity retention with planned augmentation over the project life.
Independent engineer ready
Full documentation for lender due diligence and insurance.
07 / Typical timeline
Indicative durations for a grid-scale project once permits and grid connection are secured. C&I projects are typically much faster.
2–4 mo
Detailed design, grid studies finalised, CATL equipment ordered.
3–5 mo
Production, FAT and logistics to site, in parallel with civil works.
3–6 mo
Foundations, installation, MV / HV connection and cabling.
1–2 mo
Testing, EMS integration, grid compliance and commercial operation.
OES / Contact
Tell us about your site, target power and storage duration. Our team will help shape the right CATL solution.