Engineering · Procurement · Construction

Turnkey CATL storage, delivered end to end.

From feasibility to commissioning, OES takes single-point responsibility for designing, sourcing and building your CATL energy storage project.

Six phases. One accountable partner.

A single contract covering engineering, CATL equipment supply and construction reduces interfaces, risk and time to energisation.

01

Feasibility & design

Load and yield analysis, system sizing, single-line diagrams and layout engineering.

02

Permits & grid connection

Grid studies, DSO / TSO applications and permitting support in each market.

03

Procurement

CATL batteries sourced as an official partner, plus PCS, transformers and balance of plant.

04

Construction

Civil works, foundations, installation, cabling and site safety management.

05

Commissioning

Testing, EMS integration, grid-code compliance tests and handover documentation.

06

O&M & warranty

Preventive maintenance, remote monitoring and CATL warranty management.

Grid-scale battery storage site under construction with a crane placing a container

Foundations, cabling and installation — delivered by one accountable team.

Bankable projects, built to CATL standards.

Our EPC approach combines direct access to CATL technology with local engineering and construction partners across Europe.

Engineers reviewing plans beside battery storage containers
  • Fixed-price, turnkey contracts
  • Direct CATL supply and technical support
  • Integrated EMS for day-one revenue
  • Performance and availability guarantees
  • Local teams and European compliance (CE, grid codes)
  • Long-term O&M and warranty handling

The right structure for your risk appetite.

Leading European developers and lenders choose between several delivery models. We support all of them.

Full-wrap EPC

Single point of responsibility

One contract for design, CATL supply, construction and commissioning with a fixed price, fixed date and wrapped performance guarantees. Preferred by most lenders.

Split EPC

Supply + BoP contracts

CATL equipment supplied under a separate contract while OES delivers balance of plant and integration. Lower cost, with interfaces carefully managed.

EPCM

Owner-led delivery

OES manages engineering, procurement and construction on the owner's behalf, for utilities and IPPs with in-house capabilities.

LTSA / O&M

Long-term service

10–20 year service agreements covering maintenance, availability guarantees, capacity augmentation and warranty management.

Tested at every step, from factory to grid.

  1. 01

    Design review

    Independent review of layout, fire strategy and grid studies before procurement.

  2. 02

    Factory acceptance (FAT)

    Witnessed testing of CATL containers, PCS and transformers at the factory.

  3. 03

    Site acceptance (SAT)

    Mechanical and electrical checks, insulation and protection tests on site.

  4. 04

    Grid compliance tests

    Verification against grid code and DSO / TSO requirements before energisation.

  5. 05

    Capacity test & handover

    Round-trip efficiency and usable energy verified, then full documentation handed over.

Designed to European and international standards.

Fire safety, grid compliance and electrical design follow the frameworks that insurers, grid operators and independent engineers expect.

  • IEC 62933 & IEC 62619

    Safety and performance of stationary battery systems and industrial lithium cells.

  • UL 9540A & NFPA 855

    Thermal runaway testing and fire protection design, widely accepted by European insurers.

  • EU Network Code RfG & EN 50549

    Grid connection requirements, applied through national grid codes.

  • CE marking & EU Battery Regulation

    Low Voltage, EMC and Machinery directives, plus battery passport and end-of-life obligations.

  • ISO 9001 / 14001 / 45001

    Quality, environmental and health & safety management on every site.

Structured for lenders and investors.

Financing storage in Europe depends on clear guarantees and transparent risk allocation.

Completed substation connected to battery storage containers
  • Fixed price and date

    Delay and performance liquidated damages backed by bonds.

  • Capacity & efficiency guarantees

    Guaranteed usable energy and round-trip efficiency at handover.

  • Availability guarantees

    Contractual uptime under the O&M agreement, typically 97–99%.

  • Degradation & augmentation plan

    CATL-backed capacity retention with planned augmentation over the project life.

  • Independent engineer ready

    Full documentation for lender due diligence and insurance.

From notice to proceed to energisation.

Indicative durations for a grid-scale project once permits and grid connection are secured. C&I projects are typically much faster.

2–4 mo

Engineering & procurement

Detailed design, grid studies finalised, CATL equipment ordered.

3–5 mo

Manufacturing & delivery

Production, FAT and logistics to site, in parallel with civil works.

3–6 mo

Construction

Foundations, installation, MV / HV connection and cabling.

1–2 mo

Commissioning

Testing, EMS integration, grid compliance and commercial operation.

OES / Contact

Let’s build Europe’s energy flexibility.

Tell us about your site, target power and storage duration. Our team will help shape the right CATL solution.